Monday, November 22, 2010

Signed Contracts - Final Variations List , Construction Plans, Kitchen Layout

Signed contract at Head Office on 12/11/10.
Provided building contract and papework to Bank on 15/11/10 (Monday).

Bank issued Commencement letter 16/11/10, however this went via snail mail to Wickham office and didn't make it to Parramatta till 22/11/10. I wonder when our 20 days till construction starts from ?

Anyway I'm reliably told that sometime next week we will receive final variations letter for signature , plans for construction & the Kitchen Layout. I must say other than the standard floor plan we haven't seen anything with respect to the Kitchen ? We must then sign and return paperwork to Allworth, then we will be allowed to call the construction line and find out our construction start date.

This process started for us back in April 2010..... here we are November, potentially something will start in December. Everything looks clearer in retrospect. Not sure if we would put ourselves through this waiting game again....an established home certainly would have been a far quicker option. Guess we need to get through the building first before I make any final comments.

Wednesday, November 17, 2010

Basic Variations we made to Standard Harmony

I will add to this list as I think of the things we have changed (some ideas for those reading).
  • Widened Fridge space to 1m. Overhead Cupboards at 1800 mm.
  • Cold Water Plumbing at Fridge Space.
  • Sound checking plasterboard to common walls in Media Room.
  • Cavity Sliders - Lounge to Dining, Family to Bedrooms.
  • Carpet upgrade to Godfrey Hirst Colorado 185 Antler - $1150 Inc GST - all Bedrooms, Lounge, Media.
  • Delete Carpet & change to tiles in main hallway from Family to Bedrooms/Bathroom ($135).
  • Tile Upgrade to Kitchen including chrome floor waste grills to Laundry, Bathroom & Ensuite - Tiles Direct ($800).
  • Electrical Upgrade - $1305 - Plenty of Power & Lighting including outdoor power point to Alfresco. Sufficient external lighting too. Garage covered off including two small down lights external/above pane lift doors.
  • Security Deadlock, front door & internal Garage door.
  • Add timber door to rear of Garage.
  • Ceramic Cooktop.
  • Cupboard Drawers to Ensuite.
  • Stainless steel tub to Laundry.

Monday, November 15, 2010

Our Harmony Floor Plan

A few slight variations to this plan since first going into council. Most notably the HWS Solar panels have been relocated to the Northern side roof. Otherwise it remains almost identical to the below:

We reversed the standard floor plan so that our entertaining area's would be on the Northern side. Better light and will keep the bedrooms cooler in Summer on the Southern Side.

Mowed the Lawn (523 sqs) in readiness for Commencement of Construction




Saturday, November 13, 2010

Tender Signed

Signed tender on Friday November 12th. Allworth should commence work 20 working days from receiving commencement letter from the bank.  Builders go on leave from Dec 23rd for Christmas break returning Jan 10th. We are anxious to see how much work get's done, if at all before the New Year. Would be nice to see a slab curing over the break. Mowed the lawn today in anticipation of work starting sometime soon.

Friday, November 5, 2010

Building a Complete Home Package

Welcome to our Blog. My wife and I just had our first child in July. Earlier in March 2010 we decided that we should look at building. Our existing home is just too small to raise a family. The established home Market was just so over priced at the time for what was on offer. We liked what Allworth were offering with the new Harmony design. Simple , good builder reputation and affordable. Land prices local to where we currently live were simply too expensive. And in fact we preferred the Lake Macquarie Area to be closer to family. Cooranbong is about 20 mins North of our current home. The block we eventually bought (settled in July 2010) is at the foot of the Watagan mountains. It's a very quiet street. We plan to be very happy there. We shortly sign our tender. The process has been very slow. As we are soon to sign our tender I thought it would be a good opportunity to start this blog & include some photos as construction get's started.